Sunday, August 28, 2016

post 10: day 7, electrical electrical electrical

It's Sunday! We are 7 days into our project and we could not be happier with the progress that has been made. Our electrician, Val, did a lot yesterday. Here are some pictures.
This is just entering into the kitchen: we will have 3 switches. One for the overhead kitchen lights (we are salvaging these old Boeing lights Garrett had from his previous house), LED over and under counter lighting on both sides, and one for the fan that is over our dining room table.
Lots of outlets along the north kitchen wall. 
For the downstairs bathroom, Val removed the fan/light combo we had before to be replaced with some Panasonic whisper things Garrett ordered. We got one for downstairs and one for upstairs. 
Also, a better picture of the bench with some of the insulation moved out of the way:
Switch for downstairs bathroom:

Moving to the upstairs, we have more wiring! 
Here is Garrett pointing out charred wood from an old fire in our house. Who knows when it was - we first discovered the charring when we did demo for our skylights 5 or 6 years ago. It's all over the upstairs. 