Monday, September 12, 2016

post 19: finished drywall and tile backer board

Our little escape to Hood River was totally amazing. We slept a lot, had a lot of delicious food, saw a lot of gorgeous views, tasted some delectable wine, and even met a new friend.
While we were away, the drywall guys nearly finished. We stopped by the house on Sunday afternoon and it looked like they just needed one final sand. Dmitry said the tile guys would start today. 
I just got back from the house and it looks like the final sand is done and Roman #2 (how many young, tall, handy Romans are there in Portland anyway???) is at the house installing tile backer board. I asked Roman #2 if the tile was on site but he said no, maybe tomorrow. Garrett and I are dying to see the tile!! 
upstairs bathroom with tile backer board installed. Everything you see here (except the skylight and the little bit of ceiling) will be tile. TILE ALL DAY.
upstairs bath: radiant heat floor mat + tile backer board
Master bedroom: west wall drywall
master bedroom: closet
office/bedroom 2: east wall drywall
office/bedroom 2: closet
Tile backer board work station
kitchen: drywall
north kitchen: dry wall
south kitchen: drywall
south kitchen window: drywall makes it look so finished!

exterior south kitchen window: making the most of vinyl siding

our awesome GC didn't even blink or complain when we asked if he could fix our porch.