We ended up being about 24 (!!!!!) tiles short in the downstairs bathroom. Dmitry put in an order for one more box. So completion of that will probably end up waiting until flooring is installed (tile and flooring are the same crew.)
Reggie is still busting his butt over at the house. His work is so so so superb and he really gets what we are trying to do and the look we are going for.
Hopefully Reggie can finish up tomorrow. He still has some trim work to do and he needs to hang and install our barn doors. He's uncertain if Western Pacific will really deliver the doors tomorrow and if they do deliver them, when they will show up - he needs them in the morning.
Hopefully Reggie can finish up tomorrow. He still has some trim work to do and he needs to hang and install our barn doors. He's uncertain if Western Pacific will really deliver the doors tomorrow and if they do deliver them, when they will show up - he needs them in the morning.
In the upstairs bath, grout was completed AND my recessed medicine cabinet was installed. But it's not done yet - they are going to drill a hole into the back to bring an outlet through so we can store and charge our electric toothbrushes inside. All tucked away and no cords all over the place driving me bonkers.
![]() |
| Kitchen screen wall is ALMOST done. One final piece to be measured and nailed in. |
![]() |
| Wow this looks SO much better than it did before!!! |
![]() |
| More amazing work by Reggie! Garrett asked for Tongue and Groove flooring to be installed here. It looks so nice!! |
![]() |
| Bed 2/Office closet: look! I can hang stuff in here now! |
![]() |
| Upstairs bath: grout complete. *hearts in eyes* |
![]() |
| Upstairs bath: shower pan up to bench with an infinity drain. *more heart emojis* |
![]() |
| Look! My ONE bathroom requirement has been installed!!!! |
![]() |
| Inside here will be an electrical outlet so we can plug in and hide away our toothbrushes. |
![]() |
| Master bedroom: closet dowel. |